Project Leads
Paolo Catapane, Joshua Buzzell

The aim of this Sub-Project is to increase power density and enable next generation compute. By enhancing energy efficiency and streamline power distribution, we will transition our data center infrastructure to Low Voltage Direct Current - LVDC (≤1500VDC) distribution architecture. This subproject will focus on reducing conversion losses, improve reliability, and support future scalability. The workstream will focus on integrating direct current from Medium Voltage - MV conversion to LVDC distribution, enabling interoperability and ensuring compliance with safety and operational standards. Success of this sub-project will be measured by defining: power densities significant enough to meet compute demands, reduced downtime, highest levels of operational safety, and alignment with OCP’s sustainability goals.

Scope

In Scope:

  • Evolution to LVDC distribution inside the datacenter including backward compatibility and future scalability.
  • Collection of best practices for design, build, and operation of LVDC systems.
  • Connection with industry alliances and standards bodies regarding direct current efforts.
  • Estimate timeline for transition to LVDC.
  • Energy Storage Systems - ESS
  • DC rack power architecture
  • Protection interface (hot-swap, startup sequence)
  • Energy storage strategy and hold-up requirements

Out of Scope:

  • MVDC architectures (>1500VDC)
  • In-rack components (system interface will be coordinated with OCP Rack & Power Project)

Initial Work products:

  • White paper with narrative for direct current adoption, pros and cons of different options, high-level architectures and requirements for system components (Target Release: 2026 Q1)
  • Detailed specs of system components will need to be addressed in separate workstreams
  • Recommended Reference LVDC System Architecture

Workstreams:

 

OCP DCF - Power Distribution Project Calendar

(The calendar displayed here is updated every 15-minutes from the project's Groups.io Calendar)